Southern Program Alliance, Seaford Rd Bridge

  • Foundation Piling
  • Ground Improvement

The Southern Program Alliance (SPA) is removing level crossings at Seaford Road, Seaford; Station Street and Eel Race Road, Carrum and Mascot Avenue, Bonbeach and delivering rail systems and power upgrades.

The project also includes building a new Carrum Station, connecting Station Street across the Patterson River with a new road bridge, the extension of McLeod Road through to the beach, creation of new community spaces including a village green and foreshore park and construction of the new Kananook Train Storage Facility in Seaford.

Geotech's Role:

Engaged by the SPA joint venture, Geotech was nominated to undertake the Seaford Rd foundation piling, inclusive of all materials, plant & equipment, labour and supervision required. 

Geotech was responsible for the design and construction of 80 no. continuous flight auger piles, overhead piles and 16m long controlled modulus columns to facilitate the ground improvement.

In addition to completing a substantial piling package of works, Geotech also completed several dynamic load tests and pile integrity tests.

Disciplines covered:

  • CFA piles
  • Dynamic Load Tests
  • Pile Integrity Tests
  • Controlled Modulus Columns

Contáctanos. Nuestro horario de oficina:
Lun - Vie 8:30 - 17:00

HEAD OFFICE - MELBOURNE

11 Eastern Rd, South Melbourne VIC 3205

padding-bottom: 5%; "> GEOTECH OFFICE LOCATIONS

HEAD OFFICE - MELBOURNE

174 Turner Street, Port Melbourne, VIC 3207

PERTH

Level 3, 195 Great Eastern Highway, Belmont, Western Australia 6104

+61 8 9488 8212

BRISBANE

Level 2, 100 Melbourne Street, South Brisbane, Queensland 4101

SYDNEY

Level 2, 55 Harrington Street, The Rocks, New South Wales 2000

Síguenos

Suscribir

Podría interesarte recibir información, noticias, alertas de nuestra parte...

Derechos reservados © 2020 Geotechnical Engineering.