Typically adopted as economical settlement controlling elements, CMC/Rigid Inclusions are installed with specialist high-torque rotary CFA plant with tooling featuring a displacement head to laterally displace the soil rather than extract it.

As a ground improvement technique (rather than structural pile element) CMCs are installed on a regular grid improving the in situ shear strength / moduli of the natural soils. The technique generates minimal spoil, making it a viable option for brownfield and contaminated sites. As settlement controlling elements, their common applications include the construction of new embankments, low-rise buildings, warehouses and civil infrastructure.

Get in touch, our office hours:
Mon - Fri 8:30 - 17:00

GEOTECH OFFICE LOCATIONS

HEAD OFFICE - MELBOURNE

11 Eastern Rd, South Melbourne VIC 3205

PERTH

Level 3, 195 Great Eastern Highway, Belmont, Western Australia 6104

+61 8 9488 8212

BRISBANE

Level 2, 100 Melbourne Street, South Brisbane, Queensland 4101

SYDNEY

Level 2, 55 Harrington Street, The Rocks, New South Wales 2000

Follow Us

Subscribe

Copyright © 2020 Geotechnical Engineering.

Search