Forge Tower, Docklands

Forge Tower, Docklands

  • Building
  • Foundation Piling

A recent development in the Yarra’s Edge precinct, this 30-storey tower comprises 230 apartments and ground level retail. Located on the south side of the Yarra River between the Bolte Bridge and Charles Grimes Bridge, this part of Melbourne has historically proven to be very challenging for foundation works.

Our Role

Geotech was engaged to design and construct continuous flight auger (CFA) piles for the tower columns/cores and the lesser-loaded five-level podium. The geology of this part of the Yarra Delta zone is particularly challenging as the very weak Coode Island Silt horizon extends to 25-30m depth and the Melbourne Formation bedrock is not encountered until 40-45m. This led to some piles being constructed at depths of 51m – the deepest CFA piles constructed in Australia at that time. A comprehensive program of pile dynamic load testing verified the performance of the foundation package.

Disciplines covered

  • CFA Piling – 175 total, typically 750mm/900mm dia x 45-50m depth
  • Dynamic Load Testing (PDA)

Get in touch, our office hours:
Mon - Fri 8:30 - 17:00

  • [email protected]
  • GEOTECH OFFICE LOCATIONS

    HEAD OFFICE - MELBOURNE

    11 Eastern Rd, South Melbourne VIC 3205

    PERTH

    Level 3, 195 Great Eastern Highway, Belmont, Western Australia 6104

    +61 8 9488 8212

    BRISBANE

    Level 2, 100 Melbourne Street, South Brisbane, Queensland 4101

    SYDNEY

    Level 2, 55 Harrington Street, The Rocks, New South Wales 2000

    Follow Us

    Subscribe

    You might like to get info, news, alerts from us...

    Copyright © 2020 Geotechnical Engineering.

    Search