Projects of

Infrastructure

Torrens Rail Junction Grade Separation, Adelaide SA

Torrens Rail Junction Grade Separation, Adelaide SA

  • Infrastructure

The Torrens Rail Junction is located in parklands around Port Road north of Adelaide. The separation of heavily utilised arterial roads from the suburban and freight train network was viewed as an infrastructure project of great benefit. 

Geotech was awarded critical packages of piling works involving continuous flight auger (CFA) retention piles and bridge foundation piles along the newly lowered rail alignment. The majority of the works were completed in two major rail occupations over the Easter and Queen’s Birthday weekends, including night works to minimise disruption to the metropolitan and ARTC rail lines.

 

Disciplines covered

  • CFA Piles – 450 No. 750-900mm dia x 22m

  • PDA load testing

Get in touch, our office hours:
Mon - Fri 8:30 - 17:00

  • [email protected]
  • GEOTECH OFFICE LOCATIONS

    HEAD OFFICE - MELBOURNE

    11 Eastern Rd, South Melbourne VIC 3205

    PERTH

    Level 3, 195 Great Eastern Highway, Belmont, Western Australia 6104

    +61 8 9488 8212

    BRISBANE

    Level 2, 100 Melbourne Street, South Brisbane, Queensland 4101

    SYDNEY

    Level 2, 55 Harrington Street, The Rocks, New South Wales 2000

    Follow Us

    Subscribe

    You might like to get info, news, alerts from us...

    Copyright © 2020 Geotechnical Engineering.

    Search