Southern Program Alliance, Seaford Rd Bridge

Southern Program Alliance, Seaford Rd Bridge

  • Foundation Piling
  • Ground Improvement

The Southern Program Alliance (SPA) is removing level crossings at Seaford Road, Seaford; Station Street and Eel Race Road, Carrum and Mascot Avenue, Bonbeach and delivering rail systems and power upgrades.

The project also includes building a new Carrum Station, connecting Station Street across the Patterson River with a new road bridge, the extension of McLeod Road through to the beach, creation of new community spaces including a village green and foreshore park and construction of the new Kananook Train Storage Facility in Seaford.

Geotech's Role:

Engaged by the SPA joint venture, Geotech was nominated to undertake the Seaford Rd foundation piling, inclusive of all materials, plant & equipment, labour and supervision required. 

Geotech was responsible for the design and construction of 80 no. continuous flight auger piles, overhead piles and 16m long controlled modulus columns to facilitate the ground improvement.

In addition to completing a substantial piling package of works, Geotech also completed several dynamic load tests and pile integrity tests.

Disciplines covered:

  • CFA piles
  • Dynamic Load Tests
  • Pile Integrity Tests
  • Controlled Modulus Columns

Get in touch, our office hours:
Mon - Fri 8:30 - 17:00

  • [email protected]
  • GEOTECH OFFICE LOCATIONS

    HEAD OFFICE - MELBOURNE

    11 Eastern Rd, South Melbourne VIC 3205

    PERTH

    Level 3, 195 Great Eastern Highway, Belmont, Western Australia 6104

    +61 8 9488 8212

    BRISBANE

    Level 2, 100 Melbourne Street, South Brisbane, Queensland 4101

    SYDNEY

    Level 2, 55 Harrington Street, The Rocks, New South Wales 2000

    Follow Us

    Subscribe

    You might like to get info, news, alerts from us...

    Copyright © 2020 Geotechnical Engineering.

    Search