West Gate Tunnel Project, Northern Portal

West Gate Tunnel Project, Northern Portal

  • Ground Improvement
  • Infrastructure

The West Gate Tunnel Project is set to deliver an efficient alternative to the West Gate Bridge. The completion of this project will provide a quicker and safer journey for commuters.

Prior to tunnelling commencement, a 690m section of the North Yarra Main Sewer required diverting.

The Northern Portal is a tanked bottom up structure with the excavation supported using a temporary secant pipe wall and steel strutting support system. The excavation facilitated the launching of 2 X 15.6m Tunnel Boring Machines for excavating the West Gate Tunnels.

Our Role

Geotech were engaged to supply, construct and deliver the ground engineering works to be incorporated into the Northern tunnel portal area for the West Gate Tunnel Project.
Detailed scope of works included;

  • North Yarra Main Sewer Upstream and Downstream connection and retrieval of approx. 5500m X 900mm diameter Secant Piles (hard and soft).
  • The construction of a Temporary (Concrete) Guide Wall. This included steel hollow sections and stabilised sand
  • NYMS TBM Retrieval Ground Improvement

Disciplines covered:

  • Secant Piles
  • CFA Ground Improvement Works

Get in touch, our office hours:
Mon - Fri 8:30 - 17:00

  • [email protected]
  • GEOTECH OFFICE LOCATIONS

    HEAD OFFICE - MELBOURNE

    11 Eastern Rd, South Melbourne VIC 3205

    PERTH

    Level 3, 195 Great Eastern Highway, Belmont, Western Australia 6104

    +61 8 9488 8212

    BRISBANE

    Level 2, 100 Melbourne Street, South Brisbane, Queensland 4101

    SYDNEY

    Level 2, 55 Harrington Street, The Rocks, New South Wales 2000

    Follow Us

    Subscribe

    You might like to get info, news, alerts from us...

    Copyright © 2020 Geotechnical Engineering.

    Search